ENEL (2020)
Design DDE and AS BUILT – Installation of container and hybrid module in Cernavoda Station
CET GROZAVESTI (2020)
Modernization of the combustion installations of the boiler no.1 of the Grozăvești ETC in order to comply with the environmental requirements in force
CET CRAIOVA II (2020)
Design works for the work “Elaboration of the steam pressure and temperature regulation documentation for the TA1 and TA2 150MW labyrinths of CET CRAIOVA II”
S.C. CET GOVORA S.A. (2019)
Design works-Study on the analysis of the operating regimes and on the verification of the safety in operation of the general services station 6kV-SG2
S.C. CET GOVORA S.A. (2019)
Design and technical assistance services for the work “Modernization of the electrical dedusting installations for boilers no.5 and 6 of CET GOVORA, in order to increase the dedusting performance to max.48mg/Nm3 at the outlet of the 6/0.4kV electrofilters-station and electrical lighting and fire extinguishing installations”
HIDROELECTRICA S.A. (2018)
Technical documentation for the execution of low voltage electrical and automation panels for CHE FRUNZARU
THERMOELECTRIC POWER PLANT ROVINARI (2018)
Engineering and design works necessary for the LN 4 repair of the electrofilters of block no.4 (CTE ROVINARI)