Projects
S.C. MONSSON ALMA S.R.L. CONSTANTA | Technical documentation for the establishment of the protection settings for CEE MIREASA, county of MIREASA. Constanta | 2015 |
---|---|---|
SCHNEIDER ELECTRIC FRANCE | Pantelimon Wind Farm.Design of 33/110kV Pantelimon transformer substation.Improvement of the reactive energy compensation system | 2015 |
S.C. ENEL DISTRIBUTIE DOBROGEA S.A. | Connecting the SEN to CEE MIREASA Pi=50MW | 2015 |
CEE TICHILESTI | Connection to the grid of CEE TICHILESTI, jud. Constanta | 2015 |
CEF MURGEANCA | Design works for the connection of CEF Murgeanca 1, Pi=6.868MW, Tandareni, jud. Ialomita (developer SC SONE PARK SRL) | 2015 |
SCHNEIDER ELECTRIC FRANCE | Pantelimon Wind Farm Project.33/110kV Pantelimon Transformer Station Design, Pantelimon, Romania. Constanta, phase PT+CS, DE | 2014 |
S.C. MONSSON ALMA S.R.L. CONSTANTA | 110/33kV x 40MVA Baltagesti Transformer Station Project for the connection of Targusor Wind Farm – Phase PT + Phase DEE, project verification, execution monitoring program | 2014 |
S.C. ESTWIND MERENI S.R.L. CONSTANTA | Design works for Wind Farm 65MW in MERENI area, Constanta county – Design services for the work “Connection to the TSO of CEE 65MW MERENI, in the 400/110/20kV South Medgidia Transformer Station” | 2014 |
S.C. MONSSON ALMA S.R.L. CONSTANTA | Technical documentation for the installation of capacitor banks (2MWAr) and a reactor coil (3 MVAr) in the CEE MIREASA transformer station, Constanta county | 2014 |
WINDFARM MOLDOVA NOUA | SCADA design for Windfarm Moldova Noua | 2013 |
S.C. ESTWIND MERENI S.R.L. | a) LEC 110kV CEE Mereni-station 400/110kV Medgidia SUD.Technical documentation for the Cernavoda-Constanta motorway underpass b) LEC 110kV CEE Mereni-station 400/110kV Medgidia Sud.Technical documentation for obtaining the authorization for the construction of the cable duct route (DTAC) | 2013 |
S.C. MONSSON ALMA S.R.L. CONSTANTA (2015)
Technical documentation for the establishment of the protection settings for CEE MIREASA, county of MIREASA. Constanta
SCHNEIDER ELECTRIC FRANCE (2015)
Pantelimon Wind Farm.Design of 33/110kV Pantelimon transformer substation.Improvement of the reactive energy compensation system
S.C. ENEL DISTRIBUTIE DOBROGEA S.A. (2015)
Connecting the SEN to CEE MIREASA Pi=50MW
CEE TICHILESTI (2015)
Connection to the grid of CEE TICHILESTI, jud. Constanta
CEF MURGEANCA (2015)
Design works for the connection of CEF Murgeanca 1, Pi=6.868MW, Tandareni, jud. Ialomita (developer SC SONE PARK SRL)
SCHNEIDER ELECTRIC FRANCE (2014)
Pantelimon Wind Farm Project.33/110kV Pantelimon Transformer Station Design, Pantelimon, Romania. Constanta, phase PT+CS, DE
S.C. MONSSON ALMA S.R.L. CONSTANTA (2014)
110/33kV x 40MVA Baltagesti Transformer Station Project for the connection of Targusor Wind Farm – Phase PT + Phase DEE, project verification, execution monitoring program
S.C. ESTWIND MERENI S.R.L. CONSTANTA (2014)
Design works for Wind Farm 65MW in MERENI area, Constanta county – Design services for the work “Connection to the TSO of CEE 65MW MERENI, in the 400/110/20kV South Medgidia Transformer Station”
S.C. MONSSON ALMA S.R.L. CONSTANTA (2014)
Technical documentation for the installation of capacitor banks (2MWAr) and a reactor coil (3 MVAr) in the CEE MIREASA transformer station, Constanta county
WINDFARM MOLDOVA NOUA (2013)
SCADA design for Windfarm Moldova Noua
S.C. ESTWIND MERENI S.R.L. (2013)
a)LEC 110kV CEE Mereni-station 400/110kV Medgidia SUD.Technical documentation for the Cernavoda-Constanta motorway underpass. b)LEC 110kV CEE Mereni-station 400/110kV Medgidia Sud.Technical documentation for obtaining the authorization for the construction of the cable duct route (DTAC)