ENEL (2020)
Design DDE and AS BUILT – Installation of container and hybrid module in Cernavoda Station
CET GROZAVESTI (2020)
Modernization of the combustion installations of the boiler no.1 of the Grozăvești ETC in order to comply with the environmental requirements in force
SDEE TRANSILVANIA SUD (2020)
Integration of 110kv transformer station in SCADA-DMS system – Miercurea Ciuc
SDEE TRANSILVANIA SUD (2020)
Integration of 110kv transformer station in SCADA-DMS system – Balan Station, Harghita county
S.C. CHIMCOMPLEX S.A. BORZESTI (2020)
Preparation of design documentation, including specifications for the purchase of equipment and electrical works related to Cogeneration Plant 2
S.C. MONSSON ALMA S.R.L. CONSTANTA (2020)
Technical documentation PT+DE phase for the installation of capacitor banks (2MVAR) and a reactor (3MVAR) in the MIREASA transformer substation