-Electrical GridCEZ ROMANIA (2016)Modernization of secondary circuits and SCADA integration of MILCOV transformer station, JUD. OLT November 9, 2016Read more
-Power PlantsHIDROELECTRICA S.A. (2016)Design works for “C.H.E. Movileni.Mechanical and electrical equipment and installations.Design, procurement, assembly” November 9, 2016Read more
-Power PlantsHIDROELECTRICA S.A. (2016)Elaboration of the “As Built” phase documentation related to the equipment: – 0.4kV CHE MOVILENI dam station – 220Vdc CHE MOVILENI dam station November 9, 2016Read more
-Power PlantsGRIVITA THERMOELECTRIC POWER PLANT (2016)TG1-6MW turbogenerator modernization and TG2-5.5MW turbogenerator extension at CET Grivita November 9, 2016Read more
-Electrical GridS.C. UZINA TERMOELECTRICA MIDIA S.A. (2015)Real-time measurement and monitoring system of electricity consumers in 6kV stations; replacement of measuring and recording devices in the electrical c-da chamber of 110kV station November 9, 2015Read more
-Electrical GridCHIMCOMPLEX S.A. BORZESTI (2015)Electrical project for the integration of the 8MW cogeneration group in the 6kV SRA1-SRA3 electrical scheme November 9, 2015Read more
-Electrical GridS.C. TERMOELECTRICA S.A. BORZESTI (2015)Elaboration of technical documentation – Reorganization of 6 and 0,4kV Power Stations November 9, 2015Read more
-Electrical GridTRANSELECTRICA S.A. (2015)RK automation installation for internal service panels in Ghizdaru, Gura Ialomitei and Domnesti Electricity Stations November 9, 2015Read more
-Electrical GridS.C. ELECTROCENTRALE BUCURESTI S.A. (2015)Integration of the new 110kV trafo cells related to the combined steam-gas cycle power plant in the existing 110kV station in CET BUCURESTI VEST November 9, 2015Read more
-Power PlantsELECTROCENTRALE S.A. (2015)Electrical and automation installations for “Repair of cooling pumps condensers group no.8 of 315MW-SS.E. Isalnita November 9, 2015Read more